1776 / TEST RESULTS
Witnessed testing.
Defined context.
In a witnessed bench test on November 6, 2026, a 1776 plug held 10,000 psi differential in P-110 casing, with no leakage or slippage observed during the short hold.
Keep the result at hand.
A one-page sales overview with the reported result, custom casing-size engineering, design benefits, setting-tool options and Samantha’s direct contact. Prepared November 9, 2026.
One-page digital sales pamphlet (PDF · 176 KB)REPORTED OBSERVATION
One plug.
A documented result.
Test integrity was observed under the reported bench conditions. Application decisions should use the complete engineering record and current approved limits.
| Test item | Reported context |
|---|---|
| Date | November 6, 2026 |
| Scope | One 1776 plug; bench test in P-110 casing |
| Differential pressure | 10,000 psi |
| Pressure arrangement | Pressure above a seated ball; lower side open to atmosphere |
| Setting | Standard setting tool with a Baker 20 charge |
| Ramp and hold | Quick pressure ramp and short hold |
| Observed result | No leakage or slippage observed during the short hold |
| Witness / report signatory | Charles (Chuck) Wright, NOV Corporate R&D Manager |
The reported observation applies to the tested plug and conditions. It does not establish a universal operating-pressure rating, performance for every casing ID or temperature, long-duration endurance, comparative drillout or pumpdown performance, or an NOV endorsement.
Source: signed 1776 Plug Test Report, November 6, 2026. The complete technical report is retained by the 1776 team. Contact the team to discuss the evidence and application requirements.
APPLICATION REVIEW
Take the evidence
to the job.
Confirm the selected tool, casing size and actual inside diameter, pressure direction and duration, temperature, fluids, setting-tool interface and removal plan.
